Tonight we cut the remaining stations and made ready to set them up. We could not help ourself but had to set up the stations at their position to have a look at the lines.. Beautiful hull shape!
While the stations was up in a very rudimentary way (they will be set up permanently and aligned later) we ran a fairing batten along the stations. Looked very fair to our untrained eyes. One of the front stations were obviously not good enough and will have to be replaced, but the rest of the stations looked like the real thing.
Hmmm, isn't something missing here? Should there not be a station at 160cm? I bet there should, so I'll have to have a talk with the designer about that. :-)
The rest of the evening we began fitting the deck to a kayak we need to get out of the garage.
For the next two weeks I'll be away, but I hope Frode and Omar will rip the planks. Fair the stations and set them up. Then we will be ready to start stripping once I return.
No comments:
Post a Comment